TECHNICAL SYSTEM

Galvanized profiles, bolted nodes and a repeatable portal rhythm.

The EKO-P platform keeps the same coding logic between design, production, shipment and site assembly.

EKOHALL galvanized light gauge steel portal frame concept
01 / PRIMARY FRAMEGalvanized portal frame
Representative concept image. Final sections and connections are defined by project engineering.
15-30 m

Standard clear-span family

A readable building system with a limited set of standard components.

Twin C primary members, bracing elements, secondary profiles and bolted nodes are organized through the same production-to-site coding logic.

01

Primary frame

Twin C columns and pitched rafter arrangement.

02

Stability

Knee braces, rafter ties and bracing family.

03

Envelope

Purlins, side rails, trapezoidal sheet or panels.

04

Connections

Coded parts and bolted site assembly.

15-30 METRE FAMILY

Six standard clear spans selected by project need.

Clear span selection is the first step. Building length, eave height, bay spacing and profile schedule are finalized according to location and project loads.

21
SELECTED SPAN21 metres
Defined useWarehouse · Agriculture · Sports
Representative packageDEP-21-36.2-4.8
Source statusVerified source geometry available
Profile / bayLocal engineering verification required

Source geometry and a primary profile schedule are available for the 21 m package. The final application requires verification under the governing local codes and project loads.