ASSEMBLY PROCESSES

Fast bolted light steel assembly begins with preparation, coding and readable site order.

EKOHALL reviews site preparation, anchor accuracy, portal frame erection, secondary members, envelope installation and final checks through a clear assembly sequence.

Light steel portal frame assembly and site application

PROCESS DOCUMENT

Assembly speed is prepared in design before it is achieved on site.

In modular light gauge steel industrial buildings, assembly performance depends not only on light components, but also on package order, readable connection points and a clear project sequence for the site team. Bolted system logic reduces heavy on-site fabrication and supports a cleaner installation flow.

01

Site preparation

Ground conditions, access, lifting area, unloading zones and safe working flow are reviewed before assembly.

02

Anchor checks

Foundation levels, grid dimensions, anchor positions and tolerances are checked before portal frame erection.

03

Portal frame erection

Columns, rafters, knee braces and primary connection elements form the main rhythm of the structure.

04

Purlins, girts and bracing

Roof purlins, wall girts, wind bracing and stability members complete the structural behaviour.

05

Envelope installation

Trapezoidal sheets, sandwich panels, ridge, gutter and facade accessories are installed according to use case.

06

Final review

Connection tightness, envelope continuity, openings, drainage details and handover notes are reviewed at closure.

The assembly process is finalized with site safety planning, employer conditions and project engineering. Share your use case and dimensions to begin the first review.