PROCESS DOCUMENT
Assembly speed is prepared in design before it is achieved on site.
In modular light gauge steel industrial buildings, assembly performance depends not only on light components, but also on package order, readable connection points and a clear project sequence for the site team. Bolted system logic reduces heavy on-site fabrication and supports a cleaner installation flow.